TECHNICAL ENQUIRY

Start with the installed part and the evidence you already have.

Use this structure to prepare the information needed for a replacement review. Missing items can remain open—they should be identified, not guessed.

BEFORE YOU SEND

Useful information to collect.

  1. 01
    Identify the press and position

    Plant, line, equipment tag, existing part reference.

  2. 02
    Prepare the technical basis

    Drawing or photo references, sample data, measurements or specification.

  3. 03
    Explain the maintenance context

    Planned replacement, inspection finding, outage or reliability work.

  4. 04
    Mark unknowns clearly

    Unknown dimensions or requirements are better left open than assumed.